The Exploratory Works Environmental Impact Statement (EIS) report has been released. Explore this portal to find out about what Exploratory Works involves, the outcome of the EIS report and next steps.

Snowy 2.0

Interactive EIS map

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Snowy 2.0

Key findings

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Snowy 2.0

EIS report

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.


Snowy 2.0

Snowy 2.0 Exploratory Works Overview

The Exploratory Works Environmental Impact Statement is available for public comment until 20th August 2018. Watch this short video for an introduction to Exploratory Works.

Snowy 2.0

Message from Snowy Hydro CEO

Snowy Hydro CEO Paul Broad introduces you to the Snowy 2.0 EIS portal and invites your feedback.


Snowy 2.0

What is Snowy 2.0?

Snowy 2.0 is a pumped hydro project in the Snowy Mountains that will increase Snowy Hydro’s generation capacity by up to 2000 megawatts, and at full capacity, will provide approximately 350,000 megawatt hours of energy storage.

Snowy 2.0

What is an EIS?

An EIS is a publicly available document that provides information on a project, including its environmental impacts and mitigation measures, and is used to inform development consent decisions if the project is approved.

Snowy 2.0

Other reports

An EIS report is required for each phase of the proposed Snowy 2.0 project, before construction can commence. Other reports will be developed as Snowy 2.0 continues to progress.


Home | Interactive EIS map | Key findings | Engagement | Next steps | EIS report | Glossary of terms